
Project
About this project
Located on Umm Al Nar island approximately 20km from Abu Dhabi, the refinery operates an 88,000 bbl/day crude distillation unit, a 14,000 bbl/day catalytic reformer, naphtha, gasoil and kerosene hydrotreating units and an LPG recovery unit. Castle Electrodes supplied reference electrodes for the cathodic protection monitoring system protecting the refinery's reinforced concrete structures.



